TAEYOUNG INDUSTRY Tank Terminal got ready up-to-date material system by extension of the newest equipment investment.
To make a circumstance of fast material industry, we prepared Inventory confirmation system in each Tank through the Internet and entry auto confirmation with EDI channel of the Office of Customs Administration
and also we prepared automation equipment of oil supply and shipping, regular goods analyzing system for managing the qualities and ISO 9002 certification
system which coincide to international standard, furthermore we actualized the stable management by installing auto checking devices for main operating equipments with the CMMS(Computerized Maintenance Mamagement System).
Through the management of BSP program, we strengthen security business, and by installing a device against discharge VOC£ómaterial, we reduced the air-pollution material so that we are trying to become a close-environment company.
The institution of shipping and loading ships and barges
The institution of Tank truck
Drum packaging
Pipe arrangement and oil supply to Ulsan oil chemical area
Weigh equipment of Tank truck
Fill up Nitrogen
Heating goods to keep temperature
Hiring out 107 Tanks(300KL ~ 10.000KL)
4 private berths
Underground pipelines to Ulsan petrochemical complex
Computerized system and auto gauging facilities
Direct access to main computer through INTERNET for delivery order
Largest tank terminal in South Korea
Longest bulk handling experiences
Focus on customer satisfaction
Strict safety and environmental standard inventory and shipment history